Capacity Improvement Renovation Case of China Multi-Cavity Molds for Medical Plastic Bottles
Capacity Improvement Renovation Case of China Multi-Cavity Molds for Medical Plastic Bottles Medical plastic bottles are commonly used for reagent storage, sampling container and pharmaceutical packaging. These products have strict requirements on dimensional consistency, cleanliness and extractable substance control. Mold renovation cannot blindly pursue shorter cycle time. It must guarantee that modified products meet medical molding specifications without new appearance defects or contamination risks. This renovation project targets a 16-cavity medical PP preform mold. The mold has been in mass production for two years. Long-term operation brings problems such as large weight deviation between cavities, uneven cooling, long molding cycle and ejection scratches on individual parts. The supporting machine is a 160-ton horizontal injection machine. The original cycle time was 32 seconds, with stable single-shift output of about 13500 pieces. Faced with rising customer orders and limited stations in clean workshop, the renovation goal is to shorten cycle time within 24 seconds without adding new equipment, and control weight difference between cavities within ±0.03g.
Problem Inspection and Data Confirmation Before Renovation
Continuous sampling and monitoring were carried out before modification. Weight, wall thickness, appearance defects and temperature difference of cooling water inlet and outlet of each cavity were recorded. The original mold adopted cold runner structure. The runner length was inconsistent, leading to insufficient filling pressure at remote cavities. Cavities near the main gate suffered over-packing, resulting in thick bottle wall and extended cooling time.

The cooling layout was outdated. The cooling channels inside cores were straight single circuits, far away from the molding surface. Heat dissipation of cores was slow. The inner wall of preforms cooled behind outer wall, leaving high internal stress. Deformation risk after ethylene oxide sterilization increased. The ejection system only used a single ring ejector. Vacuum adsorption formed between preform and core during high-speed ejection, so ejection speed had to be limited to avoid whitening and scratches at the bottle mouth. The exhaust depth was set according to general plastic parts. Insufficient exhaust at remote cavities caused occasional burning black spots, which are directly rejected for medical products. Operators had to reduce injection speed to avoid burning and further lengthen the cycle.
Optimization of Gating System
The cold runner was replaced by valve-gated hot runner which meets medical molding standards. The inner surface of hot runner was polished to reduce material stagnation and lower the risk of PP degradation and precipitation. The runner layout was redesigned into symmetrical circular distribution to ensure equal melt flow distance to each cavity. Valve pin opening timing was adjusted to balance filling pressure and eliminate underfilling in remote cavities. Gate size and transition shape were recalculated to reduce shear heat and avoid local overheating and material decomposition. Cold material scrap was largely removed, cutting raw material waste and saving cooling and packing time for cold slug. The hot runner was divided into independent temperature zones for stable molding of medical-grade PP material.
Upgrade of Cooling System
Cooling renovation is the core of cycle reduction. Original cores were replaced with new cores with spiral baffle cooling channels. Spiral channels are close to the inner molding surface to improve heat exchange efficiency. Annular surrounding channels were added on cavity side. Cooling loops were grouped by every four cavities with flow control valves for water balance adjustment. Quick coupling sealing joints were adopted to prevent water leakage and contamination in clean workshop. The inner wall of cooling channels was polished and anti-rust treated to avoid scale blockage during long production. After modification, temperature difference between core and cavity decreased obviously. The cooling speed of inner and outer wall of preforms became synchronized, internal stress was reduced and cooling time could be shortened.
Matching Adjustment of Ejection and Exhaust Structure
Auxiliary air inlet structure was added inside cores to break vacuum adsorption. Low-pressure clean air is supplied synchronously with ejection movement to reduce ejection resistance and support faster ejection. Exhaust slots were re-ground according to PP material characteristics. Exhaust near weld lines was widened properly while depth was strictly controlled to prevent flash. Removable exhaust inserts were installed on parting lines. Carbon residue can be cleaned by taking out inserts instead of full mold disassembly. Ejection synchronization was recalibrated with extra guide structures on ejector plate to prevent tilted ejector rings and bottle mouth deformation. All inserts and ejection parts are made of S136 stainless steel for corrosion resistance and stable clean production.

Mold Trial Verification and Process Solidification
Low-parameter trial molding was carried out in clean workshop after assembly. Weight, wall thickness and appearance data were collected continuously. Hot runner temperature, valve pin timing and cooling water flow were fine-tuned for gradual speed-up. Finally, stable cycle time reached 23.5 seconds, meeting the target. Weight deviation of each cavity was controlled within ±0.025g. 72-hour continuous mass production test showed no black spots, scratches or mouth deformation. Samples were sent for extractable test and sterilization compatibility test. All indicators comply with medical packaging standards. Standard operation documents were issued, including cleaning procedure, hot runner maintenance schedule and descaling plan. Weight sampling records were required for each shift. After renovation, single-shift output increased to 18200 pieces, capacity raised by about 35% without new injection machines and clean workshop stations. Raw material loss was also reduced.
Summary and Reference for Similar Projects
Capacity renovation of medical multi-cavity molds differs from ordinary daily chemical packaging molds. All modifications cannot sacrifice cleanliness and safety indicators of medical products. Runner balance and cooling system are prioritized before ejection and exhaust adjustment. It is not feasible to shorten cycle only by increasing injection speed. Complete mass defect data and fixed raw material grade are required before renovation. Compliance tests must be arranged during trial and verification phase to avoid unqualified products after capacity upgrade. Symmetrical hot runner, spiral core cooling and air-assisted ejection are mature speed-up schemes for thin-wall PP and PE medical container molds. They fit factories with growing orders and limited workshop space.