How Injection Molding Quotation Is Calculated: Material, Labor and Mold Amortization
Injection molding quotation is not a simple sum of raw material price. It integrates one-time mold investment, material consumption, machine hours, labor, waste, management expense and tax. The large price gap between different suppliers comes from different calculation standards for mold amortization, yield rate and machine cost. Understanding the quotation composition helps review quotes and avoid hidden risks from low-price offers.
1. Raw Material Cost Calculation
Raw material accounts for the largest proportion of the quotation. It is calculated based on the single part weight plus runner and flash waste, multiplied by the material unit price. Cold runner molds produce runner scrap, which must be counted in material consumption. Recycled runner material can reduce cost within the agreed mixing ratio. Hot runners minimize waste and are suitable for high-cost engineering plastics. Filler, color masterbatch and drying treatment cost also need to be considered.

2. Machine Hour and Equipment Depreciation Cost
Machine cost is calculated by tonnage, hourly rate and molding cycle. The required tonnage is determined by the projected area and clamping force. The shorter the cycle time, the more parts produced per hour and the lower the unit machine allocation. The hourly rate includes equipment depreciation, electricity, cooling water and daily maintenance. Secondary operations such as trimming and annealing also add extra working hours.
3. Labor Cost
Labor cost covers machine operators, quality inspectors and packaging workers. Automated workshops with robotic pickers have low labor allocation. Manual picking and gate trimming increase labor cost. Appearance-critical or medical parts require full inspection, which raises inspection labor. Packaging methods, night shift subsidies and social insurance are converted into unit labor cost.
4. Mold Cost Amortization
There are two common quotation modes for molds. The first is separate mold payment, the customer owns the mold and the unit price does not include mold amortization. The second mode spreads mold cost into the unit price. If the follow-up order quantity fails to reach the agreed volume, the supplier cannot recover the mold investment, which may lead to quality reduction or price increase. The amortization quantity, adjustment rule and mold ownership must be clearly written in the contract. Normal maintenance is borne by the factory, while revision caused by design changes is charged separately.

5. Waste, Management, Tax and Profit
Zero scrap is impossible in mass production. A yield coefficient is reserved in quotation, and precision appearance parts have higher waste cost. Management cost covers drawing review, mold flow analysis, process debugging, warehousing and logistics. VAT and freight are included according to trade terms. Reasonable profit is reserved. Low-price competition often cuts inspection standards and process steps, bringing unstable quality.
6. Common Quotation Misunderstandings
Many buyers only compare unit price without checking the quotation preconditions. Different quotes may have different standards on yield, regrind ratio, mold ownership and inspection requirements. All parameters including part weight, material grade, cycle time, yield and acceptance standard should be confirmed before comparison. Injection molding quotation is a prediction of full-cycle project cost, and order volume, tolerance and mold scheme all affect the final price.