What Should Be Included in Mold Maintenance Contracts: Service Cycle and Responsibility Division

2026-11-20 17:01:07 Plastic Molds

Injection molds are high-value precision tooling. Long-term continuous production will lead to wear, rust, seal aging and enlarged guide clearance. A standardized maintenance contract clarifies service frequency, work scope and responsibilities of both parties, avoiding disputes after unexpected shutdown caused by mold failure, and stabilizing mold service life and product yield. Simple regular maintenance clauses are insufficient. The contract should define maintenance grading, execution cycle, spare part ownership, fault judgment and compensation boundary.

1. Basic mold information and maintenance scope

The contract lists all molds with unique number, corresponding product name, cavity quantity, weight, hot runner configuration and special structures such as slides, lifters and oil cylinders. It also marks storage location and matched injection machine model. Differentiate routine maintenance items and extra repair works. Routine maintenance is covered by the service package, while repair, mold modification and engineering change are value-added items with separate quotation. Clearly state that the contract covers preventive maintenance, excluding emergency repair caused by improper operation, material contamination or foreign object crash.

injection mould

2. Maintenance grading and execution cycle

Maintenance work is divided into daily, primary and secondary maintenance according to working depth and downtime. Daily maintenance is finished by operators on each shift, including cleaning parting surface, checking water joint leakage and clearing residual material in vents. This basic work belongs to the user and is not included in vendor’s on-site service. Primary maintenance is scheduled every 30 days or 100,000 shots, whichever comes first. Service technicians inspect ejection system, lubricate guide pins, check clearance of slides and lifters, clean cooling channels, retighten screws and test hot runner circuits. A maintenance record form is submitted after service. Secondary deep maintenance is arranged every 90 days or 500,000 shots, whichever comes first. It requires partial disassembly to clean carbon deposit and oil stain, inspect cavity and texture damage, check aging of sealing parts and heating elements, calibrate positioning accuracy and replace standard wearing parts. Annual comprehensive maintenance includes full dimension inspection and mold health assessment report to predict remaining service life. The contract specifies whether time or shot count is the priority trigger standard to avoid disagreement.

3. Responsibility allocation of both parties

The mold user shall provide safe shutdown window, notify maintenance schedule in advance and guarantee power, water and pressure relief for safety. The user needs to provide original drawings and historical repair records, use the mold within specified process limits, avoid over-pressure and over-temperature operation, and prevent metal foreign matter. After maintenance, the user checks items and signs on the report. If the mold fails due to pre-existing hidden damage, unauthorized structural change or non-specified raw material, the user takes full responsibility. The maintenance vendor sends certified mold technicians to complete all checklist items. The vendor records mold condition truthfully and submits written risk alerts for wear, crack, water leakage and hot runner abnormality with corrective suggestions. Operate properly to prevent secondary damage during disassembly. Every maintenance service delivers a photo-based report and establishes a mold maintenance file. If mold damage is caused by inadequate maintenance, insufficient lubrication or blocked cooling channels, the vendor bears corresponding repair cost.

injection mould

4. Spare parts, consumables and payment terms

Distinguish consumables and spare parts in the contract. Lubricant, sealing tape and cleaning solvent are covered by the vendor. High-value components including ejector pins, sleeves, springs, heating rings, thermocouples, hot runner nozzles and inserts are purchased by the user or sourced by the vendor with separate payment. Discuss stocking plan for fast-wearing parts to shorten emergency repair time. Confirm settlement method: monthly, per-service or annual package. Any extra repair outside the checklist must get written approval before construction.

5. Fault judgment, acceptance and breach clauses

Set the fault identification process. Both parties inspect the mold together after shutdown, and classify failures into three categories: faults caused by insufficient maintenance, faults caused by improper production and natural aging wear. Acceptance follows standardized checklist, verifying smooth movement, no water leakage and tight fastening. The vendor must rework for free if the service fails acceptance. Agree on liability for delayed maintenance, overdue payment and early termination notice.

6. Additional supplementary terms

Clarify transportation risk and insurance if the mold needs to be moved to the vendor’s workshop for deep overhaul. Add confidentiality clauses to protect mold drawing and product structure data. Each maintenance service carries a short warranty period, normally 7 to 15 days. The vendor provides free recheck if the same defect recurs at the same position within the warranty period. A complete maintenance contract converts verbal agreements into enforceable rules. Cycle clauses slow mold degradation, and responsibility division clarifies risk boundary, reducing production loss caused by mold downtime.

injection mould